Insight from Richard Lungmuss
I thought this week I would discuss the effects of the weather on the railway, highly topical after the recent failure of the COP 31 talks in Turkey, and the blisteringly hot Summer we have just experienced, inevitably causing delays and disruption on our railways. That got me thinking of my own experiences on the railway and how the “blame game” works. One thing is for certain, the weather is going to become more extreme in the future so we had better understand what we are in.
When I was the Infrastructure Maintenance Manager in Kent we started to experiment with painting key pieces of infrastructure white in Summer. This demonstrably lowers the rail temperature on hot days by as much as 5 degrees and I am pleased this is now widespread across the UK rail network. [Interestingly the European railways prefer not do adopt this technique, believing that painting key infrastructure might prevent identification of defects.] We were also very aware in Kent of the high clay content of some of our embankments and how they are affected by drought. This Summer’s de-railment near Lewes reminded me that Kent and Sussex get a very continental type climate, with high Summer temperatures and dry weather becoming the norm.
My personal experiences with weather related effects came when I moved to York as Route Director LNE. I learnt during my 3 year tenure that the “wisdom of Solomon” is required when it comes to the weather. In the Winter of 2010 we experienced a real cold snap, with snow on the ground for 6 weeks. The first thing we discovered on a bitterly cold day was that many of our points heaters [deployed nationwide to prevent points from freezing and highly effective] had been stolen, or had their copper content stolen. The resulting disruption was placed at Network Rail’s door and of course checking heaters is at the top of everyone’s cold weather infrastructure check list. The next cold weather related incident came after reports of passengers on the platform at Retford being narrowly missed by ballast thrown up by ice and snow dropping off a through Class 91 service. [The snow built up between the carriages, froze hard and then dropped off at high speed, hitting the ballast, which ricocheted all over the place] I spoke with the MD of the TOC concerned and we agreed that for safety we needed to place an 80mph speed restriction on services. That was followed a couple of hours later by the very irate MD of another TOC complaining that his services were being held behind slow running ECML Class 91 services. Naturally it was Network Rail that had to pay for all the delays. The joys of running a mixed railway!
My expeience on just how far reaching cold weather effects are on the railway concerns a massive traffic jam on the M8 outside Glasgow in December 2010. Along with the rest of the UK population I watched the story unfold as the road was blocked for 2 days, with hundreds of cars abandoned and the Scottish Transport Minister forced to apologise in parliament. Little did I realise that this was about to be laid at my door! I received a call from the DfT, asking why salt deliveries had not been reaching Scotland by rail, and demanding an explanation. This surprised me because I had spoken directly with the on site Local Operations Manager (LOM) before the cold snap and emphasised how important the deliveries from Boulby mine in Cumbria were. I reflected this back to the DfT but within hours I was told that this was not happening and Network Rail were being significantly blamed for the Scottish chaos. At which point I called the LOM again and he advised me that all services were running, despite significant snow. He faxed me the box instructions from Crag Hall signal box demonstrating this and I was able to assert factually to the DfT that NR LNE were NOT the cause of the lack of salt on Scotland’s roads. [The Minister did resign the day after the freeze ended but I never found out whether the issue of road salt was a major factor in his decision!]
The one thing I saw during this lengthy period of highly inclement weather was how well the industry pulled together. Emergency timetables were put in place, maintenance staff worked day and night to get to site in horrendous conditions and the “will to win” was tangible. As a direct result of this freeze we deployed far more 4-wheel drive vehicles across the route.
Of course Summer also brought with it interesting challenges, sometimes rather unexpected ones. Following a prolonged dry spell in 2011 our embankments were tinder dry. We received reports that many miles of embankment were on fire following the running of a steam train between York and Newark. Apparently there was a firebox fault on the loco “Sir Lamiel”. The resulting delays totalled around £1m of schedule 8 delay payments from Network Rail. At which point I took the decision to ban weekday running of steam trains on the ECML until further notice. Well! You would have thought that I had shot Bambi! I was firmly in the PR firing line but I have never been accused of being indecisive.
And with that romp through the seasons we reach Autumn and “leaves on the line”. The railway could certainly never be accused of being unprepared for Autumn and over the years the various remedies for the effects of Autumn have grown. Pre-treatment trains run, jetting the leaves off the line and laying sandite to promote adhesion. Some trains have sandboxes which add sand when braking, and many newer trains have Wheel Slide Protection (WSP). We did have some interesting discussions with the TOCs when we were accused of not treating the rails at a specific point and a train went past a signal at danger (SPAD). The train in question had an empty sandbox so the attribution rumbled on for weeks! [Presumably NOT a problem once GBR is fully up and running?]
Whilst on the subject of Autumn and lineside fires the question about vegetation management is important. Maybe the ideal railway is one in which there is no lineside vegetation to catch fire or drop leaves? However, that may then contribute to a loss of shade and maybe the effects of hot weather on rails are more detrimental than leaves on the line?!
I haven’t mentioned the effects of rain during this piece and of course our winters are getting wetter, with more extreme downpours causing flash flooding. Rail drainage and stability of embankments during wet weather events is going to be another feature of rail’s future and will require significant investment. The countryside outside the rail boundary is a factor too and I am reminded of a flood we had on the railway in the NorthEast where it was determined that a farmer’s change of ploughing patterns in an adjacent field had significantly increased the run off onto the railway!
Finally to return to this Summer’s events, where two trains de-railed over a particularly how spell of weather. I would not wish to comment on the incidents but they do highlight the fact that rail in the UK is stressed to 27 degrees. That is felt to be a “Goldilocks” temperature, neither too hot or too cold. The problem in the UK is that whilst average and maximum Summer temperatures are rising, we are also prone to very cold weather events too. Stressing the rail to higher than 27 degrees could result in broken rails in periods of cold weather with the safety ramifications that brings. For now the remedy in hot weather will be constant surveillance and speed restrictions when temperatures reach a certain level. This is also true for overhead electric cables, which can sag in hot weather and also become unstable on certain lines in high winds.
This opinion piece has tried to highlight some of the intricacies of managing a railway that is now being operated in very different climactic conditions to that of our Victorian forbears. We are likely to see continuing disruption in the future caused by both foreseen and unforeseen weather events, which are likely to increase. Whilst it is always easy to allocate blame when these happen, I hope that I have offered some examples above that show just how difficult it is for those adjudged responsible to do the right thing. Our passengers are always going to want on time trains but they also rightly expect the railway to be run safely. The weather is going to continue to make this difficult going forward and perhaps the public need to be given much more information about just how difficult it is to run a safe and reliable railway in the current climate?